TECHNICAL PROJECTS
The preparation of Book “The Industry Ecology System of Municipality waste management”
Country Albania
Proportion carried out by candidate 100%
No of staff provided 7
Name of client Min of Environment Taulat BINO (Voice Minister)
Origin of funding Science Ministry
Dates (start/end) June 2007 -December 2009
The reference contact Aleksander Garuli; (ex. Voice minister)
Project general objective
The preparation of the exercises and seminar realisation for the eco treatment of municipality waste.
The preparation of website for develop curricula, The preparation new courses, teaching and training material to adapt the curricula of European waste management education (new teaching techniques) to increase attractiveness of waste management courses including the numbers of participant students..
Main project tasks:
Task 1 –Information Search and Analysis: Search and analysis of the information, ground inspection and
field data collection.
Task 2 – The action plan on The study and the evaluation of the possibilities for the recycle of the plastic waste and legislation framework on the support of fiscal facilities on this sector
Task 3– The programmer for decreasing of the plastic waste, The programmer for collection and administration of the plastic waste up to the final recycling;
Task 4 – Technical project Technical project for setting up the new additional legislation for the recycling of the plastic waste.
Task 5 – The programmer for the selection and accumulation of the plastic waste in the resource; The preparation of the operation’s plan for the management and administration of the plastic waste is made in serving of the infrastructure cleaning of the urban zone
Task 6 -The assessment of the accumulation and deposit’s cost The assessment of the accumulation and deposit’s cost for the plastic waste and compilation of the respective budgets
THE STUDY AND THE EVALUATION OF THE POSSIBILITIES FOR THE RECYCLE OF THE PLASTIC WASTE AND LEGISLATION FRAMEWORK ON THE SUPPORT OF FISCAL FACILITIES ON THIS SECTOR
Country Albania
Proportion carried out by candidate 100%
No of staff provided 7
Name of client Min of Environment Taulat BINO (Voice Minister)
Origin of funding Dutch Embassy
Dates (start/end) June 2006 -December 2006
The reference contact Aleksander Garuli; (ex. Voice minister)
Project general objective
The objective is that, through an advanced contemporary study to be realized the plastic waste evaluation, their recycling possibilities, also the presentation and the description of the current legislation on the support of fiscal facilities, which will be used on this sector. The recycling of the plastic waste is another link in the concept of the urban waste management. The development of the recycling technology would reduced the volume of the urban waste, which can not be eliminated eventually.
Main project tasks:
Task 1 –Information Search and Analysis: Search and analysis of the information, ground inspection and
field data collection.
Task 2 – The action plan on The study and the evaluation of the possibilities for the recycle of the plastic waste and legislation framework on the support of fiscal facilities on this sector
Task 3– The programmer for decreasing of the plastic waste, The programmer for collection and administration of the plastic waste up to the final recycling;
Task 4 – Technical project Technical project for setting up the new additional legislation for the recycling of the plastic waste.
Task 5 – The programmer for the selection and accumulation of the plastic waste in the resource; The preparation of the operation’s plan for the management and administration of the plastic waste is made in serving of the infrastructure cleaning of the urban zone
Task 6 -The assessment of the accumulation and deposit’s cost The assessment of the accumulation and deposit’s cost for the plastic waste and compilation of the respective budgets.
ENVIRONMENT MANAGEMENT & AUDIT SCHEME (EMAS) FOR LOCAL GOVERNMENT.
Country Albania
Proportion carried out by candidate 100%
No of staff provided 5
Name of client Regional Center of Environment-REC for South East Europe
Origin of funding European Commission, Albania & REC
Dates (start/end) December 2005 - July 2006
The reference contact Mihallaq Qirio
Project general objective
The local government, together with the government must support the national system development, for environmental development of the companies, which identify and compensate those who get good results.
Main project tasks:
Task 1 – Encourage a wide embracement Encourage a wide embracement of the Eco-management and Audit Scheme (EMAS);
Task 2 – Information Search and Analysis: Search and analysis of the information, ground inspection and field data collection.
Task 3– Develop prompting measures Develop prompting measures for the major part of the company to publicize in a correct, independently and environmentally certified Reports;
”CONSULTANCY SERVICES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE TEN HIGH PRIORITY ENVIRONMENTAL HOT SPOTS TO FOR THE BASIS FOR A MAJOR REMEDIATION PROGRAMME, FOR THE PROJECT: “IDENTIFICATION AND PRIORITIZATION OF ENVIRONMENTAL HOT SPOTS IN ALBANIA- PROJECT UNDP ID 00059071”
Country Albania
Proportion carried out by candidate 20%
No of staff provided 6
Name of client UNDP , Tirana
Origin of funding CARDC
Dates (start/end) September 2009 - May 2010
The reference contact Klodiana Marikaj , Daniele Ariotti
Project general objective: The objective of the study is the evaluating of the environmental impact in the source regions of Patos- Marinëz, oil-treatment object and the smog level in city of Fieri. The study objectives are the define of the pollution extension from the pollution source, the selection of the important pollution indicators present in the air and in superficial waters. This selection will be realized according to the standard methods of the European Community. Will be define the pollution level in different situations and different periods. These estimate beside national and international standard will clarify the environment level pollution
Main project tasks:
Task 1 –Information Search and Analysis: Search and analysis of the information, ground inspection and field data collection.
Task 2 – Detailed Contamination study of the soil in the oil field area. Mechanical samples, soil samples water, samples, VOC measures and laboratory chemical analytics .
Task 3 – Risk analysis for the human health. The disease as a result of pollution in population of Fier area, Hospital epiclesis, Relationship with the source, Medical control, Health condition, Time of indwelling, Diagnosis, Kind of disease Treatment of illness, Time of staying in hospital, Other partner by family touched. Cost of the medicaments Endurance of healthy problems.
Task 4 – Risk analysis for the environment Content of contaminant elements in the petroleum zone Evaluation of
profile of land in Marinza area, Level of dust in Fier area and in the surrounding ones, The measurement results of smog in the Fier and in the petroleum zone near it, the quality of the air.
Task 5 – Detailed Remediation Plan. Action assessment for risk reduction.
”CONSULTANCY SERVICES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) ENVIRONMENT IMPACT ASSESSMENT, REPORT OF REGION ENVIRONMENT OF FERTILIZER NITROGENOUS, FIER.
Country Albania
Proportion carried out by candidate 90%
No of staff provided 5
Name of client Selca SPA, Sede legale, Localita Forno Allione, 25 04 0, Berzo Demo (Bs).
Origin of funding European Commission
Dates (start/end) June 2004 - July 2004
The reference contact Giuseppe RACA
Project general objective: This plant was built and started to work from the Italian company “Montecatini” in 1967. Nearly, 25 year has been produced ammonium fertilizer. It stopped the activity in 1990, After the stop, at the area and on the plant remained all the arsenical solution, including too the technology equipments, pillars, cisterns, tubing, pumps and valve sideburns. The stay for a long time to the arsenical fertilizer into the pillars constituting a serious menace to the ecological and mankind life cycle, because this plant is complete absorber. Then, we have the influence of the three factor: physical, chemical-technology and moral; which are collect together and form final destruction of plant. The result of the project was how to minimise the effect on environment and how to mitigate the negative impact during the treatment of arsenic solution and during its transport and removal to abroad.
Main project tasks:
Task-1 Insurance of the statistic information for the studying zone .The social- economic assessment of the habitants of the zone; Psycho-graphic study and studying of the needs by the questionnaire of the habitants of the zone;
Task 2 – Risk analysis for the human health. The disease as a result of pollution in population of Fier area.
Task 3 – Risk analysis for the environment. Content of contaminant elements in the arsenic. Evaluation of profile of land.
Task 4 – Detailed Remediation Plan. Action assessment for risk reduction.
Task-5 Compilation of the final report
The preparation of Book “The Industry Ecology System of Municipality waste management”
Country Albania
Proportion carried out by candidate 100%
No of staff provided 10
Name of client Ministry of Science and Education
Origin of funding Ministry of Science and Education
Dates (start/end) May 2007 – February 2009
The reference contact Mond AGOLLI
Project general objective: The final objective of the project consists in making a Book “The Industry Ecology System of Municipality waste management”
Seminar in capacity building and institutional strengthening of administrative structures of local government.
Training activities of administrative structures of local government.
STUDY OF ENVIRONMENT EDUCATION PART OF THE CIVIL EDUCATION IN SCHOOL AND INSTITUCIONAL LEVEL
Country Albania
Proportion carried out by candidate 100%
No of staff provided 8
Name of client Min. of Environment
Origin of funding Dutch Embassy
Dates (start/end) September 2004 - February 2005
The reference contact Aleksander Garuli; (ex. Voice minister)
Project general objective: The Environment always accompanies all the development stage of the society. In the conditions of an extended development of the industry and the agricultural economy intensification, the environment protection has become the most important problem all over the world. At the same time, another important problem is the rational utilization of the natural resources, from the humans. Today is clear that the rational utilization of the natural resources, from the human society, request that the human invasion is according to the ecological rules. The Nature protection request, all the society levels to be engaged with these problems, increasing or their realization level. The community realization over the necessity of the environment protection, come true by introducing the ecological phenomenon, and also with revalidating features, as televise spots, leaflets, posters etc.
Main project tasks:
Task-1 Insurance of the statistic information for the studying zone The social- economic assessment of the habitants of the zone; Psycho-graphic study and studying of the needs by the questionnaire of the habitants of the zone;
Task-2 The compilation of the zone profile; The composition of the program for the qualification of the local government personnel; The composition and implementation of the campaign for the sensibility of the public opinion; The compilation of the informative materials for the environmental resource;
Task-3 The creation of the “lobbing” The creation of the “lobbing” with the organism in the environment area for calling attention for this zone. The compilation of the questionnaire Accomplishing of the questionnaire (around 4,000 applications), The analyzes and the interpretation of the questionnaire.
Task-4 Training of the local government personnel The compilation of the campaign; The compilation of the formative materials.
Task-5 Television documentary Television documentary around 20 minutes for increasing the public sensibility for the environmental values.
Task-6 Compilation of the final report
STUDY OF DESIGN OF LANDFILL FOR HAZARDOUS WASTE LANDFILL, THE FEASIBILITY STUDY AND THE OUTLINE OF A STRATEGY FOR HAZARDOUS WASTE
Country Albania
Proportion carried out by candidate 1%
No of staff provided 3
Name of client European Commission
Origin of funding European Commission
Dates (start/end) September 2004 - September 2005
The reference contact Finish Company - Plan Center; Per COCK
Project general objective: The main objectives of this feasibility study is to assess the prerequisites for sustainable HW management, analyses the institutional and operation models including tariff policies etc; to assist Albanian government to strengthen the legal and regulatory framework for hazardous waste and outline a draft strategy; to investigate three sites in technically, environmentally, economically and financially in order to compare them and select the most preferable site for the landfill facility;
Main project tasks:
Our organization’s role was the involvement in the project by doing the Consultant as a G & G group
Task-1 Compilation of the report .Compilation of the report for the quantity of the hazardous waste in the region Fier, Kucova, Berat and Lushnje.
Task-2 Consultancy.Consultancy in the determination of the ten sites and in especially the three ones, as well as in the evaluation of the criteria for the selection of the best sites.
Task-3 Compilation of the final report